On July 27, 2022 the first Landrich to be manufactured and assembled at the new 63,000 sq ft Landrich production facility at 1 Admiral St, in Eel River Crossing New Brunswick Canada took place. The entire Landrich team was on site to inaugurate the first Landrich off the assembly line.
Celebrating the First Landrich Track Harvester Produced at the New Landrich Production Facility
by landrich2022 | Jul 29, 2022 | New Landrich | 0 comments
